Sat 6 Feb 2010
Munt la Schera tunnel – from CH to ITA
Posted by admin under Munten en Bankbiljetten
No Comments
Drive time approx. 4 min. End of March 2008. Swiss tunnel side entry is a bit chaotic; more drive lines are merged to single line without traffic control. We’ve been waiting 15-20 minutes.
Tags: coints, bankbiljetten, munten, gold coins, euro money, collecting titbits, coint, collecting